{"id":2300,"date":"2017-02-25T20:46:16","date_gmt":"2017-02-25T18:46:16","guid":{"rendered":"http:\/\/www.stavebnakomora.sk\/?page_id=2300"},"modified":"2017-06-21T13:21:03","modified_gmt":"2017-06-21T11:21:03","slug":"4_navrh-narodnej-rady-slovenskej-republiky-zmien-v-zakone-c-501796-zb-stavebny-zakon-o-projektovej-dokumentacii","status":"publish","type":"page","link":"https:\/\/www.stavebnakomora.sk\/?page_id=2300","title":{"rendered":"4_N\u00c1VRH N\u00e1rodnej rady Slovenskej republiky zmien v z\u00e1kone \u010d. 50\/1796 Zb. (stavebn\u00fd z\u00e1kon) o projektovej dokument\u00e1cii"},"content":{"rendered":"<p><a href=\"https:\/\/www.stavebnakomora.sk\/?page_id=2300\"><strong><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-2256 alignleft\" src=\"https:\/\/www.stavebnakomora.sk\/wp-content\/uploads\/2017\/02\/NRSR-4-423x600.png\" alt=\"\" width=\"30\" height=\"43\" srcset=\"https:\/\/www.stavebnakomora.sk\/wp-content\/uploads\/2017\/02\/NRSR-4-423x600.png 423w, https:\/\/www.stavebnakomora.sk\/wp-content\/uploads\/2017\/02\/NRSR-4.png 515w\" sizes=\"auto, (max-width: 30px) 100vw, 30px\" \/><\/strong><\/a><\/p>\n<p>V\u00e1\u017een\u00e1 pani poslanky\u0148a, v\u00e1\u017een\u00fd p\u00e1n poslanec,<\/p>\n<p>pre nez\u00e1ujem Ministerstva dopravy a\u00a0v\u00fdstavby rie\u0161i\u0165 problematiku verejn\u00e9ho z\u00e1ujmu ma\u0165 kvalitn\u00e9 a\u00a0bezpe\u010dn\u00e9 stavby, ku ktor\u00e9mu je nutn\u00e9 zaradi\u0165 aj kvalitn\u00fa projektov\u00fa pr\u00edpravu stavieb sme v\u00a0tomto z\u00e1ujme povinn\u00ed obozn\u00e1mi\u0165 v\u00e1s so s\u00fa\u010dasn\u00fdm stavom v\u00a0tomto segmente \u010dinnosti a\u00a0navrhn\u00fa\u0165 V\u00e1m sp\u00f4sob legislat\u00edvneho opatrenia, ako tento zhor\u0161uj\u00faci stav zastavi\u0165 a\u00a0napravi\u0165.<\/p>\n<p>P\u00f4vodn\u00fd Z\u00e1kon \u010d.50\/1976 o\u00a0\u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon) po desiatkach zmen\u00e1ch v\u00a0znen\u00ed poslednej \u00fapravy platnej od 1.1.2016 v\u00a0mnoh\u00fdch pr\u00edpadoch radik\u00e1lne zn\u00ed\u017eil a\u00a0neust\u00e1le zni\u017euje po\u017eiadavky na kvalitu, rozsah, obsah a\u00a0odbornos\u0165 projektovej pr\u00edpravy a\u00a0kontrolu uskuto\u010d\u0148ovania stavieb pod\u013ea projektu. D\u00e1vame V\u00e1m preto do pozornosti s\u00fa\u010dasn\u00fd nedobr\u00fd stav v\u00a0projektovej pr\u00edprave stavieb, ktor\u00e9mu napom\u00e1haj\u00fa aj nejasn\u00e9 a\u00a0ned\u00f4sledn\u00e9 legislat\u00edvne po\u017eiadavky na projekty stavieb pri stavebnom konan\u00ed a\u00a0po\u010das uskuto\u010d\u0148ovania stavieb. Stavebn\u00fd z\u00e1kon len v\u00e1gne predpisuje \u010do m\u00e1 stavebn\u00edk so \u017eiados\u0165ou o\u00a0stavebn\u00e9 povolenie alebo na ohl\u00e1senie stavebn\u00e9mu \u00faradu predlo\u017ei\u0165, cit. napr.:<\/p>\n<p><strong>\u00a7 58 \u017diados\u0165 o stavebn\u00e9 povolenie<\/strong><\/p>\n<p><strong>(1)<\/strong> \u017diados\u0165 o stavebn\u00e9 povolenie spolu s dokladmi a <strong><u>predp\u00edsanou dokument\u00e1ciou<\/u><\/strong> vypracovanou opr\u00e1vnenou osobou pod\u00e1va stavebn\u00edk stavebn\u00e9mu \u00faradu. V \u017eiadosti uvedie \u00fa\u010del a sp\u00f4sob u\u017e\u00edvania stavby, miesto stavby a predpokladan\u00fd \u010das jej skon\u010denia a pri stavbe na ur\u010dit\u00fa dobu aj dobu u\u017e\u00edvania stavby. (Pozn. neuv\u00e1dza ak\u00fd predpis a\u00a0ak\u00e1 dokument\u00e1cia!)<\/p>\n<p>Stavebn\u00fd z\u00e1kon po mno\u017estve \u00faprav u\u017e ne\u0161pecifikuje v\u00a0akom rozsahu a\u00a0na akej technickej \u00farovn\u00ed m\u00e1 by\u0165 vyhotoven\u00fd projekt stavby pre stavebn\u00e9 povolenie a\u00a0v\u00f4bec neprikazuje a\u00a0neupravuje, \u017ee pre uskuto\u010d\u0148ovanie stavby je potrebn\u00fd realiza\u010dn\u00fd projekt a\u00a0po ukon\u0161en\u00ed stavby m\u00e1 by\u0165 vypracovan\u00fd projekt skuto\u010dn\u00e9ho vyhotovenia stavby. V \u00a7 103 v\u0161ak stavebn\u00fd z\u00e1kon prikazuje cit.: \u201e<u>Vlastn\u00edk stavby je povinn\u00fd <strong>dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania<\/strong> stavby uchov\u00e1va\u0165 po cel\u00fd \u010das jej u\u017e\u00edvania<\/u>; pri zmene vlastn\u00edctva stavby ju odovzd\u00e1 nov\u00e9mu nadob\u00fadate\u013eovi a pri odstr\u00e1nen\u00ed stavby stavebn\u00e9mu \u00faradu.\u201c<\/p>\n<p>&nbsp;<\/p>\n<p>V\u00e1\u017een\u00e1 pani poslanky\u0148a, v\u00e1\u017een\u00fd p\u00e1n poslanec,<\/p>\n<p>tak\u00fdchto a\u00a0podobn\u00fdch rozporov a nejasnost\u00ed vo veci projektu stavby je viac, preto V\u00e1m navrhujeme a \u017eiadame V\u00e1s do doby schv\u00e1lenia naozaj nov\u00e9ho stavebn\u00e9ho z\u00e1kona schv\u00e1li\u0165 minim\u00e1lnu nepolitick\u00fa, nestran\u00edcku, neobchodn\u00fa ale v\u00fdlu\u010dne odborn\u00fa dopl\u0148uj\u00facu a\u00a0upres\u0148uj\u00facu zmenu v\u00a0z\u00e1kone \u010d.50\/1976 Zb., ktorou polo\u017e\u00edte z\u00e1klady pre zv\u00fd\u0161enie bezpe\u010dnosti stavieb, zodpovednosti projektantov,\u00a0\u00faradnej kontroly v stavebnom konan\u00ed a\u00a0pri uskuto\u010d\u0148ovan\u00ed stavieb.<\/p>\n<p>Z\u00a0uveden\u00fdch d\u00f4vodov V\u00e1m predklad\u00e1me tento legislat\u00edvny n\u00e1vrh a\u00a0\u017eiadame V\u00e1s zaobera\u0165 s\u00a0nim vo verejnom z\u00e1ujme ochrany zdravia, \u017eivota a\u00a0majetku ob\u010danov Slovenskej republiky.<\/p>\n<p>Sme pripraven\u00ed na osobn\u00e9 stretnutie s\u00a0Vami a\u00a0na vysvetlenie potrieb kvalitnej projektovej pr\u00edpravy alebo prija\u0165 vylep\u0161enia a spresnia tohto n\u00e1vrhu.<\/p>\n<p>&nbsp;<\/p>\n<p>V\u00a0Nitre d\u0148a 21.2.2017<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>SKSR Stavebn\u00e1 komora Slovenskej republiky<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Ivan Pauer<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Prezident SKSR<\/strong><\/p>\n<p style=\"text-align: center;\"><em>Pokra\u010dovanie<\/em>___________________________________________________________________<\/p>\n<p style=\"text-align: center;\"><strong>D\u00f4vody <\/strong><\/p>\n<p style=\"text-align: center;\"><strong>zmien a\u00a0doplnenia Z\u00e1kona 50\/1976 Zb. o <\/strong><strong>\u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon) <\/strong><strong>v\u00a0\u010dasti projektovej pr\u00edpravy a\u00a0projektovej dokument\u00e1cie stavieb.<\/strong><\/p>\n<p>P\u00f4vodn\u00fd z\u00e1kon \u010d.50\/1976 o\u00a0\u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon) po desiatkach zmen\u00e1ch od roku 1993 v\u00a0znen\u00ed poslednej \u00fapravy platnej od 1.1.2016 v\u00a0mnoh\u00fdch pr\u00edpadoch radik\u00e1lne zn\u00ed\u017eil a\u00a0neust\u00e1le zni\u017euje n\u00e1roky a po\u017eiadavky na rozsah, kvalitu a\u00a0odbornos\u0165 projektovej pr\u00edpravy a\u00a0kontrolu uskuto\u010d\u0148ovania stavieb pod\u013ea projektu. Stavebn\u00fd z\u00e1kon len v\u00e1gne predpisuje \u010do m\u00e1 stavebn\u00edk so \u017eiados\u0165ou o\u00a0stavebn\u00e9 povolenie alebo na ohl\u00e1senie stavebn\u00e9mu \u00faradu predlo\u017ei\u0165, cit.:<\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a7 57 Ohl\u00e1senie stavebn\u00e9mu \u00faradu<\/strong><\/p>\n<p><strong>(1) \u00a0\u00a0 <\/strong>Stavebn\u00edk je povinn\u00fd uskuto\u010dnenie stavieb, stavebn\u00fdch \u00faprav a udr\u017eiavac\u00edch pr\u00e1c uveden\u00fdch v \u00a7 55 ods. 2 vopred p\u00edsomne ohl\u00e1si\u0165 stavebn\u00e9mu \u00faradu. K ohl\u00e1seniu drobnej stavby pripoj\u00ed jednoduch\u00fd situa\u010dn\u00fd v\u00fdkres; ak ide o jednoduch\u00fa stavbu pod\u013ea \u00a7 55 ods. 2 p\u00edsm. a), pripoj\u00ed podklady s n\u00e1le\u017eitos\u0165ami \u017eiadosti o stavebn\u00e9 povolenie a <strong><u>projektov\u00fa dokument\u00e1ciu<\/u><\/strong>. Stavebn\u00fd \u00farad m\u00f4\u017ee ur\u010di\u0165, \u017ee ohl\u00e1sen\u00fa drobn\u00fa stavbu, stavebn\u00fa \u00fapravu alebo udr\u017eiavacie pr\u00e1ce mo\u017eno uskuto\u010dni\u0165 len na z\u00e1klade stavebn\u00e9ho povolenia.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> neur\u010duje na akom stupni spracovania projektu, projektov\u00fa \u0161t\u00fadiu, projekt pre stavebn\u00e9 povolenie, alebo realiza\u010dn\u00fd projekt &#8211;\u00a0v\u00a0akom rozsahu a\u00a0v akej mierke<\/em>?)<\/p>\n<p><strong>(2) <\/strong>\u00a0\u00a0 Stavebn\u00edk m\u00f4\u017ee uskuto\u010dni\u0165 stavby, stavebn\u00e9 \u00fapravy a udr\u017eiavacie pr\u00e1ce ohl\u00e1sen\u00e9 pod\u013ea odseku 1 len na z\u00e1klade p\u00edsomn\u00e9ho ozn\u00e1menia stavebn\u00e9ho \u00faradu, \u017ee proti ich uskuto\u010dneniu nem\u00e1 n\u00e1mietky. K p\u00edsomn\u00e9mu ozn\u00e1meniu stavebn\u00fd \u00farad pripoj\u00ed overen\u00fd jednoduch\u00fd situa\u010dn\u00fd v\u00fdkres a ak ide o jednoduch\u00fa stavbu pod\u013ea \u00a7 55 ods. 2 p\u00edsm. a), k p\u00edsomn\u00e9mu ozn\u00e1meniu pripoj\u00ed <strong><u>overen\u00fa projektov\u00fa dokument\u00e1ciu<\/u><\/strong>. Stavebn\u00edk m\u00f4\u017ee za\u010da\u0165 uskuto\u010d\u0148ova\u0165 ohl\u00e1sen\u00fa stavbu, stavebn\u00fa \u00fapravu alebo udr\u017eiavacie pr\u00e1ce do dvoch rokov odo d\u0148a jeho doru\u010denia stavebn\u00edkovi, pokia\u013e stavebn\u00fd \u00farad neur\u010d\u00ed inak. Ohl\u00e1sen\u00fa reklamn\u00fa stavbu, na ktorej najv\u00e4\u010d\u0161ia informa\u010dn\u00e1 plocha je men\u0161ia ako 3 m<sup>2<\/sup>, m\u00f4\u017ee stavebn\u00edk za\u010da\u0165 uskuto\u010d\u0148ova\u0165 len do jedn\u00e9ho roka odo d\u0148a doru\u010denia ozn\u00e1menia stavebn\u00e9ho \u00faradu stavebn\u00edkovi, pokia\u013e stavebn\u00fd \u00farad v od\u00f4vodnen\u00fdch pr\u00edpadoch neur\u010dil na za\u010datie stavby dlh\u0161iu lehotu.<\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/em>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> neur\u010duje na akom stupni spracovania projektu, projektov\u00fa \u0161t\u00fadiu, projekt pre stavebn\u00e9 povolenie &#8211;\u00a0v\u00a0akom rozsahu a mer\u00edtku, alebo realiza\u010dn\u00fd projekt &#8211;\u00a0v\u00a0akom rozsahu a\u00a0v\u00a0akej mierke<\/em>? <em>K\u00fdm overen\u00fa projektov\u00fa dokument\u00e1ciu<\/em>?)<\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a7 58 \u017diados\u0165 o stavebn\u00e9 povolenie<\/strong><\/p>\n<p><strong>(1)<\/strong>\u00a0\u00a0\u00a0\u00a0\u00a0 \u017diados\u0165 o stavebn\u00e9 povolenie spolu s dokladmi a <strong><u>predp\u00edsanou dokument\u00e1ciou<\/u><\/strong> vypracovanou opr\u00e1vnenou osobou pod\u00e1va stavebn\u00edk stavebn\u00e9mu \u00faradu. V \u017eiadosti uvedie \u00fa\u010del a sp\u00f4sob u\u017e\u00edvania stavby, miesto stavby a predpokladan\u00fd \u010das jej skon\u010denia a pri stavbe na ur\u010dit\u00fa dobu aj dobu u\u017e\u00edvania stavby.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> pod\u013ea ak\u00e9ho predpisu m\u00e1 by\u0165 vypracovan\u00e1 dokument\u00e1cia, ak\u00e1 dokument\u00e1cia dokladov\u00e1 vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a7 60 Stavebn\u00e9 konanie<\/strong><\/p>\n<p><strong>(1)<\/strong>\u00a0\u00a0\u00a0\u00a0 Ak predlo\u017een\u00e1 \u017eiados\u0165 o stavebn\u00e9 povolenie, najm\u00e4 <strong><u>dokument\u00e1cia <\/u><\/strong>neposkytuje dostato\u010dn\u00fd podklad pre pos\u00fadenie navrhovanej stavby alebo udr\u017eiavac\u00edch pr\u00e1c na nej alebo ak sa <strong><u>v dokument\u00e1cii<\/u><\/strong> nedodr\u017eia podmienky \u00fazemn\u00e9ho rozhodnutia, vyzve stavebn\u00fd \u00farad stavebn\u00edka, aby \u017eiados\u0165 v primeranej lehote doplnil, pr\u00edpadne aby ju uviedol do s\u00faladu s podmienkami \u00fazemn\u00e9ho rozhodnutia, a upozorn\u00ed ho, \u017ee inak stavebn\u00e9 konanie zastav\u00ed.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> ak\u00e1 dokument\u00e1cia, dokladov\u00e1 vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p><strong>(2)<\/strong>\u00a0\u00a0\u00a0\u00a0 Stavebn\u00fd \u00farad zastav\u00ed stavebn\u00e9 konanie, ak stavebn\u00edk<\/p>\n<p><em>a) <\/em>nepredlo\u017eil <strong><u>dokument\u00e1ciu<\/u><\/strong> vypracovan\u00fa opr\u00e1vnenou osobou,<\/p>\n<p><em>b)<\/em> nepreuk\u00e1zal po\u017eadovan\u00e9 n\u00e1le\u017eitosti \u017eiadosti o stavebn\u00e9 povolenie pod\u013ea \u00a7 58 ods. 2 a\u017e 4,<\/p>\n<p><em>c)<\/em> nedoplnil \u017eiados\u0165 v ur\u010denej lehote pod\u013ea odseku 1,<\/p>\n<p><em>d)<\/em> neuviedol v ur\u010denej lehote predlo\u017een\u00fa <strong><u>dokument\u00e1ciu<\/u><\/strong> do s\u00faladu s podmienkami \u00fazemn\u00e9ho rozhodnutia,<\/p>\n<p><em>e)<\/em> vzal \u017eiados\u0165 o stavebn\u00e9 povolenie sp\u00e4\u0165,<\/p>\n<p><em>f)<\/em> za\u010dal uskuto\u010d\u0148ova\u0165 stavbu predt\u00fdm, ako stavebn\u00e9 povolenie nadobudlo pr\u00e1voplatnos\u0165<\/p>\n<p>&nbsp;<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> ak\u00e1 dokument\u00e1cia, dokladov\u00e1 vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong> \u00a7 63 <\/strong><\/p>\n<p><strong><u>Dokument\u00e1ciu <\/u><\/strong>jednoduch\u00fdch a drobn\u00fdch stavieb presk\u00fama stavebn\u00fd \u00farad aj z h\u013eadiska z\u00e1ujmov, ktor\u00e9 h\u00e1ja org\u00e1ny \u0161t\u00e1tnej spr\u00e1vy pod\u013ea osobitn\u00fdch predpisov, a to najm\u00e4 vtedy, ak na pos\u00fadenie posta\u010dia v\u0161eobecn\u00e9 technick\u00e9 po\u017eiadavky na v\u00fdstavbu, vydan\u00e9 pod\u013ea tohto z\u00e1kona, alebo in\u00e9 predpisy. Stavebn\u00fd \u00farad ozn\u00e1mi dotknut\u00fdm org\u00e1nom za\u010datie stavebn\u00e9ho konania; tieto org\u00e1ny si m\u00f4\u017eu pos\u00fadenie vyhradi\u0165, s\u00fa v\u0161ak povinn\u00e9 ozn\u00e1mi\u0165 svoje stanovisko najneskor\u0161ie pri \u00fastnom pojedn\u00e1van\u00ed alebo v lehote ur\u010denej pod\u013ea \u00a7 61 ods. 3 a 5.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> ak\u00fa dokument\u00e1ciu, dokladov\u00fa vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong> \u00a7 64<\/strong><\/p>\n<p><strong>(1)<\/strong>\u00a0\u00a0\u00a0\u00a0 S org\u00e1nmi \u0161t\u00e1tnej spr\u00e1vy a s \u00fa\u010dastn\u00edkmi, ktor\u00fdch stanovisk\u00e1 a vyjadrenia k <strong><u>dokument\u00e1cii<\/u><\/strong> predlo\u017eenej pri stavebnom konan\u00ed sa opatrili pred jeho za\u010dat\u00edm, obmedz\u00ed stavebn\u00fd \u00farad prerokovanie \u017eiadosti pod\u013ea miery, v akej sa ich po\u017eiadavky splnili.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> v akej dokument\u00e1cii, dokladovej vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Stavebn\u00e9 povolenie<\/strong><\/p>\n<p><strong> \u00a7 66<\/strong><\/p>\n<p><strong>(4)<\/strong>\u00a0\u00a0\u00a0 V z\u00e1v\u00e4zn\u00fdch podmienkach uskuto\u010d\u0148ovania stavby sa pod\u013ea potreby \u010falej ur\u010d\u00ed:<\/p>\n<p><strong>a)<\/strong>\u00a0 predlo\u017eenie <strong><u>podrobnej\u0161ej dokument\u00e1cie<\/u><\/strong> e\u0161te pred za\u010dat\u00edm stavby, ktor\u00e1 je potrebn\u00e1 na kontrolu dodr\u017eania podmienok ur\u010den\u00fdch na vyhotovenie stavby,<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em> ak\u00e1 je to podrobnej\u0161ia dokument\u00e1cia? Dokladov\u00e1 vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\">Oddiel 7<\/p>\n<p style=\"text-align: center;\"><strong>U\u017d\u00cdVANIE STAVIEB<\/strong><\/p>\n<p><strong>Kolaud\u00e1cia stavieb<\/strong><\/p>\n<p><strong>\u00a7 81<\/strong><\/p>\n<p><strong>(1) \u00a0\u00a0<\/strong>\u00a0 V kolauda\u010dnom konan\u00ed stavebn\u00fd \u00farad najm\u00e4 sk\u00fama, \u010di sa stavba uskuto\u010dnila pod\u013ea <strong><u>dokument\u00e1cie<\/u><\/strong> overenej stavebn\u00fdm \u00faradom v stavebnom konan\u00ed a \u010di sa dodr\u017eali zastavovacie podmienky ur\u010den\u00e9 \u00fazemn\u00fdm pl\u00e1nom z\u00f3ny alebo podmienky ur\u010den\u00e9 v \u00fazemnom rozhodnut\u00ed a v stavebnom povolen\u00ed. \u010ealej sk\u00fama, \u010di skuto\u010dn\u00e9 realizovanie stavby alebo jej u\u017e\u00edvanie nebude ohrozova\u0165 verejn\u00fd z\u00e1ujem, predov\u0161etk\u00fdm z h\u013eadiska ochrany \u017eivota a zdravia os\u00f4b, \u017eivotn\u00e9ho prostredia, bezpe\u010dnosti pr\u00e1ce a technick\u00fdch zariaden\u00ed.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 akej dokument\u00e1cie, dokladovej vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p><strong>(4) \u00a0<\/strong>\u00a0\u00a0 S kolauda\u010dn\u00fdm konan\u00edm sa m\u00f4\u017ee spoji\u0165 konanie o zmene stavby (\u00a7 68), pokia\u013e sa skuto\u010dn\u00e9 realizovanie podstatne neodchy\u013euje od <strong><u>dokument\u00e1cie<\/u><\/strong> overenej stavebn\u00fdm \u00faradom v stavebnom konan\u00ed.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 akej dokument\u00e1cie, dokladovej vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a7 87 Nevyhnutn\u00e9 \u00fapravy<\/strong><\/p>\n<p><strong>(2) \u00a0\u00a0<\/strong>\u00a0 Ak sa na uskuto\u010dnenie nevyhnutnej \u00fapravy vy\u017eaduje <strong><u>dokument\u00e1cia<\/u><\/strong> alebo in\u00e9 podklady, stavebn\u00fd \u00farad ulo\u017e\u00ed vlastn\u00edkovi stavby alebo stavebn\u00e9ho pozemku ich predlo\u017eenie v ur\u010denom rozsahu a lehote. V pr\u00edpade nesplnenia ulo\u017eenej povinnosti m\u00f4\u017ee stavebn\u00fd \u00farad obstara\u0165 <strong><u>potrebn\u00fa dokument\u00e1ciu<\/u><\/strong> alebo podklady na n\u00e1klady povinn\u00e9ho. Po ich zabezpe\u010den\u00ed stavebn\u00fd \u00farad nariadi vykonanie \u00fapravy a ur\u010d\u00ed podmienky a lehotu jej uskuto\u010dnenia.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 ak\u00e1 dokument\u00e1cia, dokladov\u00e1 vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu? Ak\u00e1 je to potrebn\u00e1 dokument\u00e1cia?) <\/em><\/p>\n<p><strong>(3) \u00a0\u00a0<\/strong>\u00a0 Ak nevyhnutn\u00e1 \u00faprava, ktor\u00e1 sa m\u00e1 nariadi\u0165, nevy\u017eaduje <strong><u>dokument\u00e1ci<\/u>u<\/strong> alebo in\u00e9 podklady, ulo\u017e\u00ed stavebn\u00fd \u00farad vlastn\u00edkovi stavby alebo stavebn\u00e9ho pozemku vykonanie \u00fapravy a ur\u010d\u00ed rozsah, sp\u00f4sob, podmienky a lehotu jej uskuto\u010dnenia.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 ak\u00fa dokument\u00e1ciu, dokladov\u00fa vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Konanie o dodato\u010dnom povolen\u00ed stavby<\/strong><\/p>\n<p><strong>\u00a7 90<\/strong><\/p>\n<p><strong>(2)<\/strong> \u00a0\u00a0\u00a0 V rozhodnut\u00ed, ktor\u00fdm sa naria\u010fuje alebo povo\u013euje odstr\u00e1nenie stavby, ur\u010d\u00ed stavebn\u00fd \u00farad podmienky pre zabezpe\u010denie nevyhnutnej <strong><u>dokument\u00e1ci<\/u>e<\/strong> odstra\u0148ovanej stavby, pre odborn\u00e9 vedenie pr\u00e1c a bezpe\u010dnosti, v\u010d\u00edtane okolit\u00fdch stavieb, \u010falej podmienky vypl\u00fdvaj\u00face zo v\u0161eobecn\u00fdch technick\u00fdch po\u017eiadaviek na v\u00fdstavbu a podmienky pre archivovanie dokument\u00e1cie.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 akej dokument\u00e1cie, dokladovej vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>(4)<\/strong> \u00a0\u00a0\u00a0 Stavebn\u00fd \u00farad m\u00f4\u017ee v podmienkach rozhodnutia o odstr\u00e1nen\u00ed stavby<\/p>\n<p>e) ulo\u017ei\u0165 povinnos\u0165 odovzda\u0165 <strong><u>dokument\u00e1ciu<\/u><\/strong> stavby na \u00fa\u010dely evidencie a archivovania.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 ak\u00fa dokument\u00e1ciu, dokladov\u00fa vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu alebo v\u0161etko spolu?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a7 103<\/strong><\/p>\n<p>Vlastn\u00edk stavby je povinn\u00fd <strong><u>dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania<\/u><\/strong> stavby uchov\u00e1va\u0165 po cel\u00fd \u010das jej u\u017e\u00edvania; pri zmene vlastn\u00edctva stavby ju odovzd\u00e1 nov\u00e9mu nadob\u00fadate\u013eovi a pri odstr\u00e1nen\u00ed stavby stavebn\u00e9mu \u00faradu.<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 ak\u00fa <\/em><em>dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania<\/em><em>, dokladov\u00fa vyjadren\u00ed \u00faradov, posudky, stavebn\u00e9 a\u00a0mont\u00e1\u017ene denn\u00edky, projekt skuto\u010dn\u00e9ho realizovania ako o\u00a0m\u00e1 ulo\u017ei\u0165 ke\u010f mu nikto ani z\u00e1kon neuklad\u00e1 tak\u00fd projekt vyhotovi\u0165? A<\/em><em>lebo uschov\u00e1va v\u0161etko spolu?) <\/em><\/p>\n<p><strong>\u00a7 104<\/strong><\/p>\n<p><strong>(2)<\/strong> \u00a0\u00a0\u00a0 Stavebn\u00fd \u00farad m\u00f4\u017ee vlastn\u00edkovi stavby nariadi\u0165, aby obstaral <strong><u>dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania<\/u><\/strong> stavby v pr\u00edpadoch, ke\u010f nebola v\u00f4bec vyhotoven\u00e1, nezachovala sa alebo nie je v n\u00e1le\u017eitom stave. Pokia\u013e nie je nevyhnutn\u00e9 vyhotovi\u0165 \u00fapln\u00fa dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania stavby, ulo\u017e\u00ed stavebn\u00fd \u00farad iba vyhotovenie zjednodu\u0161enej dokument\u00e1cie (pasport stavby).<\/p>\n<p>(<strong><em>Pozn\u00e1mka:<\/em><\/strong><em>\u00a0 ak\u00fa <\/em><em>dokument\u00e1ciu skuto\u010dn\u00e9ho realizovania<\/em><em>, dokladov\u00fa vyjadren\u00ed \u00faradov, posudky, projekt a\u00a0v\u00a0akom rozsahu alebo v\u0161etko spolu? Ak\u00e1 je to zjednodu\u0161en\u00e1 dokument\u00e1cia, v\u00a0akom rozsahu a\u00a0\u010do obsahuje?) <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Z\u00e1verom.<\/strong><\/p>\n<p>Vy\u0161\u0161ie uveden\u00e9 defin\u00edcie potreby dokument\u00e1cie pre stavebn\u00e9 konanie a\u00a0stavebn\u00fa \u010dinnos\u0165 sp\u00f4sobuj\u00fa nejasnosti v\u00a0po\u017eiadavk\u00e1ch na rozsah administrat\u00edvnej dokument\u00e1cie pre potreby stavebn\u00e9ho konania, v\u00fdstavby, \u00fadr\u017eby, kolaudovan\u00ed a\u00a0v\u00a0konan\u00ed o dodato\u010dnom stavebnom povolen\u00ed. Z\u00a0tohto titulu \u010dasto prich\u00e1dza k\u00a0probl\u00e9mom v\u00a0administrat\u00edvnej \u00faradnej f\u00e1ze schva\u013eovacom konan\u00ed\u00a0 hlavne po\u010das v\u00fdstavby od jej zah\u00e1jenia po ukon\u010denie.<\/p>\n<p>Projekt pre stavebn\u00e9 povolenie je len administrat\u00edvno-technickou \u201edokument\u00e1ciou\u201c stavby pre jej osadenie v\u00a0danom \u00fazem\u00ed na z\u00e1klade ktorej stavebn\u00e9 \u00farady stavbu povolia, alebo nepovolia.<\/p>\n<p>V\u00a0s\u00fa\u010dasnej stavebnej praxi u\u017e roky ch\u00fdba nutnos\u0165 vyhotovi\u0165 a\u00a0schv\u00e1li\u0165 realiza\u010dn\u00fd projekt na ktor\u00fd sa odvol\u00e1va aj st\u00e1vaj\u00faci stavebn\u00fd z\u00e1kon, dokonca ho vy\u017eaduje archivova\u0165 alebo vyhotovi\u0165 na stavbu u\u017e roky existuj\u00facu ak nebola vyhotoven\u00e1 pred v\u00fdstavbou nepovolenej stavby.<\/p>\n<p>Tento nejasn\u00fd rozporn\u00fd stav bez potreby v\u00fdstavby pod\u013ea realiza\u010dn\u00e9ho projektu m\u00e1 negat\u00edvny vplyv na postup v\u00fdstavby a\u00a0jej priebe\u017en\u00fa technick\u00fa kontrolu stavebn\u00fdm dozorom a\u00a0v\u00a0kone\u010dnom d\u00f4sledku na kvalitu a\u00a0technick\u00fa \u017eivotnos\u0165 stavieb.<\/p>\n<p>Prax z\u00a0posudzovania skolabovan\u00fdch kon\u0161trukci\u00ed stavieb, alebo stavieb cel\u00fdch, pr\u00edpadne ich \u010dast\u00ed, s\u00fadnymi znalcami a\u00a0expertmi ukazuje ve\u013emi komplikovan\u00fa a\u00a0zd\u013ahav\u00fa cestu zis\u0165ovanie pr\u00ed\u010din kolapsu stavieb, alebo ich \u010dast\u00ed, \u010do nie v\u00a0jednom pr\u00edpade sp\u00f4sobuje nemo\u017enos\u0165 objekt\u00edvne vy\u0161etri\u0165 hav\u00e1riu a\u00a0jej pr\u00ed\u010diny.<\/p>\n<p>Na z\u00e1klade vy\u0161\u0161ie uveden\u00fdch d\u00f4vodov navrhujeme schv\u00e1li\u0165 a vykona\u0165 navrhovan\u00e9 zmeny a\u00a0opravy z\u00e1kona \u010d. 50\/1976 Zb. Z\u00e1kon o \u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon).<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>V\u00a0Nitre d\u0148a 21.2.2017<\/p>\n<p><strong><br \/>\n<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>SKSR Stavebn\u00e1 komora Slovenskej republiky<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Ivan Pauer<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Prezident SKSR<\/strong><\/p>\n<p style=\"text-align: center;\">\n","protected":false},"excerpt":{"rendered":"<p>V\u00e1\u017een\u00e1 pani poslanky\u0148a, v\u00e1\u017een\u00fd p\u00e1n poslanec, pre nez\u00e1ujem Ministerstva dopravy a\u00a0v\u00fdstavby rie\u0161i\u0165 problematiku verejn\u00e9ho z\u00e1ujmu ma\u0165 kvalitn\u00e9 a\u00a0bezpe\u010dn\u00e9 stavby, ku ktor\u00e9mu je nutn\u00e9 zaradi\u0165 aj kvalitn\u00fa projektov\u00fa pr\u00edpravu stavieb sme v\u00a0tomto z\u00e1ujme povinn\u00ed obozn\u00e1mi\u0165 v\u00e1s so s\u00fa\u010dasn\u00fdm stavom v\u00a0tomto segmente \u010dinnosti a\u00a0navrhn\u00fa\u0165 V\u00e1m sp\u00f4sob legislat\u00edvneho opatrenia, ako tento zhor\u0161uj\u00faci stav zastavi\u0165 a\u00a0napravi\u0165. P\u00f4vodn\u00fd Z\u00e1kon \u010d.50\/1976 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2231,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2300","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2300"}],"version-history":[{"count":3,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2300\/revisions"}],"predecessor-version":[{"id":2315,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2300\/revisions\/2315"}],"up":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2231"}],"wp:attachment":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}