{"id":2316,"date":"2017-02-25T21:30:48","date_gmt":"2017-02-25T19:30:48","guid":{"rendered":"http:\/\/www.stavebnakomora.sk\/?page_id=2316"},"modified":"2017-02-25T21:55:57","modified_gmt":"2017-02-25T19:55:57","slug":"5_navrh-narodnej-rady-slovenskej-republiky-zmien-v-zakone-c-501796-zb-o-uzemnom-planovani-a-stavebnom-poriadku-stavebny-zakon-o-udrzbe-a-o-vypratani-a-uzatvoreni-stavby","status":"publish","type":"page","link":"https:\/\/www.stavebnakomora.sk\/?page_id=2316","title":{"rendered":"5_N\u00c1VRH N\u00e1rodnej rady Slovenskej republiky zmien v z\u00e1kone \u010d. 50\/1796 Zb. o \u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon), o \u00fadr\u017ebe a o vypratan\u00ed a uzatvoren\u00ed stavby."},"content":{"rendered":"<p>V\u00e1\u017een\u00e1 pani poslanky\u0148a, v\u00e1\u017een\u00fd poslanec,<\/p>\n<p>pre nez\u00e1ujem Ministerstva dopravy a\u00a0v\u00fdstavby rie\u0161i\u0165 problematiku verejn\u00e9ho z\u00e1ujmu ma\u0165 kvalitn\u00e9 a\u00a0bezpe\u010dn\u00e9 stavby, ku ktor\u00e9mu je nutn\u00e9 zaradi\u0165 aj kvalitn\u00fa \u00fadr\u017ebu stavieb a\u00a0st\u00e1le \u010dastej\u0161ie havarijn\u00e9 situ\u00e1cie stavieb na Slovensku, sme v\u00a0tomto z\u00e1ujme povinn\u00ed obozn\u00e1mi\u0165 v\u00e1s so s\u00fa\u010dasn\u00fdm stavom v\u00a0tak\u00fdchto pr\u00edpadoch a\u00a0navrhn\u00fa\u0165 V\u00e1m sp\u00f4sob legislat\u00edvneho opatrenia, ako tento zhor\u0161uj\u00faci stav zastavi\u0165 a\u00a0napravi\u0165.<\/p>\n<p>St\u00e1le \u010dastej\u0161ie sa stret\u00e1vame s\u00a0v\u00e1\u017enymi poruchami mostov\u00fdch kon\u0161trukci\u00ed a\u00a0stavieb pozemn\u00e9ho stavite\u013estva postaven\u00fdch hlavne v\u00a0rokoch 1998 a\u017e 2016 \u2013 zatia\u013e. Tento stav sme definovali u\u017e v\u00a0inom sprievodnom liste pre V\u00e1s, ale mus\u00edme pouk\u00e1za\u0165 na nedobr\u00fa skuto\u010dnos\u0165, ktor\u00fa potvrdzuj\u00fa aj \u0161t\u00e1tni \u00faradn\u00edci na \u0161koleniach pre stavebn\u00e9 \u00farady, \u017ee cca 42 \u00a7 stavebn\u00e9ho z\u00e1kona je \u0165a\u017eko, alebo v\u00f4bec nepou\u017eite\u013en\u00fdch.<\/p>\n<p>Medzi tieto \u00a7 patri aj dnes nevyhovuj\u00faca a\u00a0neposta\u010duj\u00faca \u00faprava \u00a7 86 \u00dadr\u017eba stavby a \u00a7 96 Vypratanie stavby z\u00e1kona \u010d.50\/1976 o\u00a0\u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon).<\/p>\n<p>Z\u00a0uveden\u00fdch d\u00f4vodov a\u00a0z\u00a0d\u00f4vodu aktu\u00e1lne havarijn\u00e9ho stavu cestn\u00e9ho mostu zaraden\u00e9ho do najvy\u0161\u0161ieho VII stup\u0148a nebezpe\u010denstva v\u00a0obci Ni\u017en\u00e1 a\u00a0z\u00a0d\u00f4vodu, \u017ee boli vykonan\u00e9 nedostato\u010dn\u00e9 opatrenia verejn\u00e9ho ohrozenia os\u00f4b na zdrav\u00ed a\u00a0\u017eivote V\u00e1m predklad\u00e1me tento legislat\u00edvny n\u00e1vrh a\u00a0\u017eiadame V\u00e1s zaobera\u0165 s\u00a0s\u00a0nim vo verejnom z\u00e1ujme ochrany zdravie, \u017eivota a\u00a0majetku.<\/p>\n<p>&nbsp;<\/p>\n<p>V\u00a0Nitre d\u0148a 17.2.2017<\/p>\n<p style=\"text-align: center;\"><strong>SKSR Stavebn\u00e1 komora Slovenskej<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Ivan Pauer<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Prezident SKSR<\/strong><\/p>\n<p style=\"text-align: center;\"><em>Pokra\u010dovanie<\/em>___________________________________________________________________<\/p>\n<p style=\"text-align: center;\"><strong>N\u00e1vrh<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>N\u00e1rodnej rady Slovenskej republiky na zmenu \u2013 noveliz\u00e1ciu z\u00e1kona \u010d.50\/1976 Zb. o\u00a0\u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon) o\u00a0\u00fadr\u017ebe stavieb \u00a7 86 a\u00a0o vypratan\u00ed a uzatvoren\u00ed stavieb \u00a7 96.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>D\u00f4vodom v\u00a0z\u00e1ujme Slovenskej republiky na \u00fa\u010dely tohto n\u00e1vrhu je skuto\u010dnos\u0165, ktorej existencia m\u00e1 z\u00e1sadn\u00fd v\u00fdznam pre opr\u00e1vnen\u00fd verejn\u00fd z\u00e1ujem ob\u010danov Slovenskej republiky z h\u013eadiska \u00faloh \u0161t\u00e1tu ma\u0165 bezpe\u010dn\u00e9 a\u00a0kvalitn\u00e9 stavby po\u010das ich u\u017e\u00edvania a\u00a0v\u00a0pr\u00edpade zistenia z\u00e1va\u017en\u00fdch a\u00a0nebezpe\u010dn\u00fdch por\u00fach ohrozuj\u00facich ich stabilitu, dynamick\u00fa a\u00a0statick\u00fa bezpe\u010dnos\u0165. Tento n\u00e1vrh dop\u013a\u0148a, upravuje a\u00a0men\u00ed vybran\u00e9 \u010dasti stavebn\u00e9ho poriadku v\u00a0z\u00e1kone 50\/1976 Zb. Z\u00e1kon o \u00fazemnom pl\u00e1novan\u00ed a stavebnom poriadku (stavebn\u00fd z\u00e1kon) v aktu\u00e1lne platnom znen\u00ed a to:<\/p>\n<p><strong>\u00a7 86 \u00a0 \u00dadr\u017eba stavby<\/strong><\/p>\n<p><strong>(1)\u00a0<\/strong> Vlastn\u00edk stavby je v s\u00falade s dokument\u00e1ciou overenou stavebn\u00fdm \u00faradom a s rozhodnut\u00edm stavebn\u00e9ho \u00faradu (stavebn\u00e9 povolenie, kolauda\u010dn\u00e9 rozhodnutie) povinn\u00fd udr\u017eiava\u0165 stavbu v dobrom stavebnom a\u00a0technickom stave tak, aby nevznikalo nebezpe\u010denstvo de\u0161trukcie stavby, alebo jej \u010dasti, nebezpe\u010denstvo po\u017eiarnych a hygienick\u00fdch z\u00e1vad v\u00a0jej interi\u00e9ri a\u00a0v exteri\u00e9ri, aby nedo\u0161lo k\u00a0po\u0161kodeniu \u017eivotn\u00e9ho prostredia, aby nedoch\u00e1dzalo k znehodnoteniu alebo ohrozeniu vzh\u013eadu stavby alebo budovy, a aby sa \u010do najviac udr\u017eala a pred\u013a\u017eila technick\u00e1 \u017eivotnos\u0165 a\u00a0u\u017e\u00edvate\u013enos\u0165 stavby.<\/p>\n<p><strong>(2)\u00a0<\/strong> Stavebn\u00fd \u00farad v\u00a0r\u00e1mci svojej \u010dinnosti a\u00a0miestnej p\u00f4sobnosti dohliada a\u00a0eviduje vizu\u00e1lny stav stavieb \u201eod ulice\u201c, prij\u00edma, eviduje a\u00a0rie\u0161i podnety verejnosti v\u00a0tejto veci.<\/p>\n<p><strong>(3)\u00a0<\/strong> Ak vlastn\u00edk stavbu riadne neudr\u017eiava, stavebn\u00fd \u00farad je vo verejnom z\u00e1ujme povinn\u00fd nariadi\u0165, aby sa v ur\u010denej lehote a za ur\u010den\u00fdch podmienok vykonaj n\u00e1pravu.<\/p>\n<p><strong>(4)\u00a0<\/strong> U\u017e\u00edvatelia stavby s\u00fa vo verejnom z\u00e1ujme povinn\u00ed strpie\u0165 a\u00a0umo\u017eni\u0165 vykonanie nariadenej \u00fadr\u017eby, pr\u00edpadne opravu stavby. V\u00a0pr\u00edpade, \u017ee zhor\u0161enie technick\u00e9ho a\u00a0vizu\u00e1lneho stavu \u00a0\u00a0 stavby bolo sp\u00f4soben\u00e9 u\u017e\u00edvate\u013emi stavby, s\u00fa u\u017e\u00edvatelia stavby v\u00a0plnom rozsahu ich zavinenia povinn\u00ed sa podie\u013ea\u0165 na n\u00e1kladoch na odstr\u00e1nen\u00ed tak\u00fdchto z\u00e1vad.<\/p>\n<p><strong>(5)\u00a0<\/strong> U\u017e\u00edvatelia bytov a nebytov\u00fdch priestorov s\u00fa vo verejnom z\u00e1ujme povinn\u00ed umo\u017eni\u0165 vykonanie nariadenej \u00fadr\u017eby, pr\u00edpadne opravy stavby. V\u00a0pr\u00edpade, \u017ee zhor\u0161enie technick\u00e9ho\u00a0 a\u00a0vizu\u00e1lneho stavu stavby bolo sp\u00f4soben\u00e9 u\u017e\u00edvate\u013emi bytov, s\u00fa u\u017e\u00edvatelia bytov v\u00a0takejto stavbe povinn\u00ed primerane sa podie\u013ea\u0165 na n\u00e1kladoch na odstr\u00e1nenie tak\u00fdchto z\u00e1vad v\u00a0plnom rozsahu ich zavinenia.<\/p>\n<p><strong>(6)\u00a0<\/strong> Ustanovenia odseku 1 a\u017e 5 platia primerane aj pre ter\u00e9nne \u00fapravy, komunik\u00e1cie a\u00a0plochy, pr\u00edpojn\u00e9 siete a\u00a0zariadenia, ktor\u00e9 s\u00fa pri\u013eahlou s\u00fa\u010das\u0165ou stavby pod\u013ea tohto z\u00e1kona.<\/p>\n<p><strong>(7)\u00a0<\/strong> Vlastn\u00edk stavby je povinn\u00fd vykon\u00e1va\u0165 pravide\u013en\u00fa, protokolom ukon\u010den\u00fa odborn\u00fa technick\u00fa prehliadku alebo s\u00fadnoznaleck\u00e9 pos\u00fadenie v\u0161etk\u00fdch vizu\u00e1lne pr\u00edstupn\u00fdch nosn\u00fdch a\u00a0nenosn\u00fdch stavebn\u00fdch kon\u0161truk\u010dn\u00fdch \u010dast\u00ed stavby po\u010das existencie stavby \u00a0 a\u00a0budovy pod\u013ea druhu vyu\u017eitia najmenej :<\/p>\n<p>&nbsp;<\/p>\n<p><strong>a)\u00a0<\/strong> stavba a budova pre kr\u00e1tkodob\u00e9, do\u010dasn\u00e9 a\u00a0trval\u00e9 b\u00fdvanie ka\u017ed\u00fdch 5 rokov;<\/p>\n<p><strong>b)\u00a0<\/strong> stavba pre slu\u017eby, zdravotn\u00edctvo a\u00a0sklady ka\u017ed\u00e9 3 roky;<\/p>\n<p><strong>c)\u00a0<\/strong> stavba pre v\u00fdrobu ka\u017ed\u00e9 2 roky;<\/p>\n<p><strong>d)\u00a0<\/strong> stavby cestn\u00fdch komunik\u00e1cii okrem mostov a\u00a0tunelov ka\u017ed\u00e9 2 roky;<\/p>\n<p><strong>e)\u00a0<\/strong> stavby cestn\u00fdch mostov a\u00a0tunelov najmenej raz za ka\u017ed\u00fdch 5 rokov ak nie s\u00fa star\u0161ie ako 15 rokov od povolenia ich u\u017e\u00edvania,\u00a0ka\u017ed\u00e9 2 roky ak s\u00fa star\u0161ie ako 15 rokov\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a ka\u017ed\u00fd 1 rok nad 50 rokov veku stavby.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>(8)\u00a0<\/strong> Stavby, ich vybavenie, pr\u00edslu\u0161enstvo a\u00a0zariadenia, ktor\u00e9 nie s\u00fa uveden\u00e9 v\u00a0bode (7) \u00a7 86 sa pod\u013ea ich druhu, kon\u0161trukcie, charakteru a\u00a0pou\u017eitia riadia osobitn\u00fdmi predpismi a\u00a0normami.<\/p>\n<p><strong>(9)\u00a0<\/strong> Ak s\u00fa lehoty odbornej technickej prehliadky alebo s\u00fadnoznaleck\u00e9ho pos\u00fadenia stavieb uveden\u00fdch v\u00a0odstavci (7) tohto bodu upraven\u00e9 in\u00fdmi predpismi, riadia sa pos\u00fadenia t\u00fdmito predpismi ak nie s\u00fa lehody medzi pos\u00fadeniami dlh\u0161ie ako ustanoven\u00e9 lehoty v\u00a0odstavci (7) tohto bodu. Rozsah vykonania pos\u00fadenia stavu stavby sa uplatn\u00ed v\u00a0takom pr\u00edpade ten, ktor\u00fd je podrobnej\u0161\u00ed.<\/p>\n<p><strong>(10)\u00a0<\/strong> Projektant m\u00f4\u017ee ur\u010di\u0165 aj in\u00e9, krat\u0161ie lehoty vykonania odbornej obhliadky v\u00a0z\u00e1vislosti na vyu\u017eitie stavby a\u00a0pou\u017eit\u00e9 kon\u0161truk\u010dn\u00e9 syst\u00e9my a\u00a0materi\u00e1ly.<\/p>\n<p><strong>(11)\u00a0<\/strong> Vlastn\u00edk reklamnej stavby je povinn\u00fd zabezpe\u010di\u0165 po\u010das celej doby trvania reklamnej stavby jej ozna\u010denie menom a priezviskom, obchodn\u00fdm menom, n\u00e1zvom, ochrannou zn\u00e1mkou alebo in\u00fdm symbolom, ktor\u00fd umo\u017e\u0148uje identifik\u00e1ciu vlastn\u00edka reklamnej stavby.<\/p>\n<p><strong>(12)\u00a0<\/strong> Vlastn\u00edk reklamnej stavby je v s\u00falade s dokument\u00e1ciou overenou stavebn\u00fdm \u00faradom a s rozhodnut\u00edm stavebn\u00e9ho \u00faradu (ohl\u00e1senie, stavebn\u00e9 povolenie, kolauda\u010dn\u00e9 rozhodnutie) povinn\u00fd udr\u017eiava\u0165 tak\u00fato stavbu v dobrom stavebnom a\u00a0technickom stave tak, aby nevznikalo nebezpe\u010denstvo de\u0161trukcie stavby, alebo jej \u010dasti, nebezpe\u010denstvo ohrozenia a\u00a0obmedzenia pohybu os\u00f4b a\u00a0dopravn\u00fdch prostriedkov v\u00a0pri\u013eahlom okol\u00ed, aby nedoch\u00e1dzalo k znehodnoteniu alebo ohrozeniu vzh\u013eadu stavby, a aby neru\u0161ila dopravn\u00e9 zna\u010denie a\u00a0pri\u013eahl\u00fa dopravu a\u00a0aby neru\u0161ila panor\u00e1mu krajiny.<\/p>\n<p><strong>(13)\u00a0<\/strong> Vlastn\u00edk alebo spr\u00e1vca stavby je povinn\u00fd vykona\u0165 opatrenia ustanoven\u00e9 v\u00a0protokole odborn\u00e9ho posudku stavu stavby a\u00a0je povinn\u00fd ich ohl\u00e1si\u0165 pod\u013ea tohto z\u00e1kona pr\u00edslu\u0161n\u00e9mu stavebn\u00e9mu \u00faradu.<\/p>\n<p><strong>(14)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee vlastn\u00edk alebo spr\u00e1vca stavby nevykon\u00e1 opatrenia ustanoven\u00e9 v\u00a0protokole odborn\u00e9ho posudku stavu stavby, je stavebn\u00fd \u00farad povinn\u00fd mu tieto opatrenia nariadi\u0165 v\u00a0pr\u00edpade, \u017ee maj\u00fa s\u00favislos\u0165 so statickou a\u00a0dynamickou bezpe\u010dnos\u0165ou stavby, alebo maj\u00fa s\u00favis s\u00a0vonkaj\u0161\u00edm estetick\u00fdm vzh\u013eadom, alebo m\u00f4\u017ee vznikn\u00fa\u0165 ohrozenie na zdrav\u00ed a\u00a0\u017eivote os\u00f4b v\u00a0interi\u00e9ri, alebo v\u00a0pri\u013eahlom exteri\u00e9ri stavby, alebo budovy.<\/p>\n<p><strong>(15)\u00a0<\/strong> Ak vlastn\u00edk stavby (aj reklamnej) alebo jej spr\u00e1vca nevykon\u00e1 opatrenia pod\u013ea nariadenia stavebn\u00e9ho \u00faradu, stavebn\u00fd \u00farad nariadi vykona\u0165 tieto opatrenia inej organiz\u00e1cii, v\u00a0provom rade riadenej miestnou samospr\u00e1vou, v\u00a0druhom rade verejnnou spr\u00e1vou a\u00a0v\u00a0tre\u0165om rade komer\u010dnou spolo\u010dnos\u0165ou priamym zadan\u00edm na n\u00e1klady vlastn\u00edka, alebo spr\u00e1vcu v\u00a0z\u00e1vislosti na ich konanie a\u00a0nekonanie.<\/p>\n<p><strong>(16)\u00a0<\/strong> Stavebn\u00fd \u00farad nezodpoved\u00e1 za pr\u00edpadn\u00e9 vzniknut\u00e9 n\u00e1klady a \u0161kody ak svoje rozhodnutie o\u00a0vykonan\u00ed \u00fadr\u017eby stavby vydal a\u00a0vykonal pod\u013ea ustanoven\u00ed \u00a7 86.<\/p>\n<p><strong>\u00a7 96 \u00a0 Vypratanie a\u00a0uzatvorenie stavby<\/strong><\/p>\n<p><strong>(1)<\/strong> \u00a0\u00a0\u00a0\u00a0 Ak je stavba v takom stave, \u017ee bezprostredne ohrozuje \u017eivot alebo zdravie os\u00f4b, nariadi stavebn\u00fd \u00farad vlastn\u00edkovi a\u00a0spr\u00e1vcovi stavby jej vypratanie; odvolanie proti rozhodnutiu nem\u00e1 odkladn\u00fd \u00fa\u010dinok. Ak ide o stavbu obsahuj\u00facu byty, stavebn\u00fd \u00farad upovedom\u00ed vlastn\u00edka stavby, aby u\u017e\u00edvate\u013eom ohrozenej stavby zabezpe\u010dil bytov\u00fa n\u00e1hradu,<a href=\"http:\/\/www.zakonypreludi.sk\/zz\/1976-50#f1589365\"><sup>9<\/sup>)<\/a>.\u00a0 Ak u\u017e\u00edvatelia dobrovo\u013ene nevyprac\u00fa stavbu, nariadi vlastn\u00edkovi aby zabezpe\u010dil vykonanie rozhodnutia.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Dop\u013a\u0148a sa bod (1) :<\/strong><\/p>\n<p><strong>a)\u00a0<\/strong> Ak stavebn\u00fd \u00farad s\u00e1m zist\u00ed zjavn\u00e9 poruchy stavby s\u00a0podozren\u00edm, \u017ee m\u00f4\u017ee \u00eds\u0165 o\u00a0poruchu ohrozuj\u00facu stabilitu stavby alebo jej \u010dasti, vyzve vlastn\u00edka stavby, alebo jej spr\u00e1vcu aby dal vyhotovi\u0165 odborn\u00fd, alebo s\u00fadnoznaleck\u00fd posudok na zistenie z\u00e1va\u017enosti poruchy s\u00a0n\u00e1vrhom na nevyhnutn\u00e9 opatrenia.<\/p>\n<p><strong>b)\u00a0<\/strong> Stavebn\u00fd \u00farad ur\u010d\u00ed lehotu na predlo\u017eenie posudku vlastn\u00edkovi (pr\u00edpadne spracovate\u013eovi) najviac do 14 kalend\u00e1rnych dn\u00ed pod\u013ea z\u00e1va\u017enosti stavu stavby, rozsahu a\u00a0n\u00e1ro\u010dnosti zis\u0165ovania posudzovate\u013eom. Vlastn\u00edk, alebo spr\u00e1vca stavby je povinn\u00fd do 3 kal. dn\u00ed stavebn\u00e9mu \u00faradu ozn\u00e1mi\u0165 u\u00a0koho objednal pos\u00fadenie poruchy, pr\u00edpadne stavby.<\/p>\n<p><strong>c)\u00a0<\/strong> Ak vlastn\u00edk, alebo spr\u00e1vca stavby zist\u00ed zjavn\u00e9 poruchy stavby s\u00a0podozren\u00edm, \u017ee m\u00f4\u017ee \u00eds\u0165 o\u00a0poruchu ohrozuj\u00facu stabilitu stavby, alebo jej bezpe\u010dnos\u0165 in\u00fdm sp\u00f4sobom pr\u00edpadne ohrozenie okolia stavby in\u00fdm sp\u00f4sobom, je tento povinn\u00fd da\u0165 vyhotovi\u0165 odborn\u00fd, alebo s\u00fadnoznaleck\u00fd posudok na zistenie z\u00e1va\u017enosti poruchy s\u00a0n\u00e1vrhom na nevyhnutn\u00e9 opatrenia. Pre \u00fa\u010dely tohto z\u00e1kona sa \u201ein\u00fdm sp\u00f4sobom\u201c rozumie napr. vyp\u00fa\u0161\u0165anie \u0161kodliv\u00edn do ovzdu\u0161ia, vysok\u00e1 hlu\u010dnos\u0165 a\u00a0pod. do interi\u00e9ru alebo exteri\u00e9ru stavby.<\/p>\n<p><strong>d)\u00a0<\/strong> Vlastn\u00edk, alebo spr\u00e1vca stavby je po doru\u010den\u00ed posudku pod\u013ea bodu a) a\u017e c) \u00a7 96 tohto z\u00e1kona povinn\u00fd neodkladne vykona\u0165 opatrenia odporu\u010den\u00e9 v\u00a0posudku.<\/p>\n<p><strong>e)\u00a0<\/strong> Po doru\u010den\u00ed posudku je vlastn\u00edk, alebo spr\u00e1vca stavby povinn\u00fd neodkladne, najviac v\u0161ak do 3 kal. dn\u00ed stavebn\u00e9mu \u00faradu tento posudok doru\u010di\u0165 a\u00a0p\u00edsomne ozn\u00e1mi\u0165 ak\u00e9 opatrenia vykonal v\u00a0s\u00falade s\u00a0odporu\u010den\u00edm v posudku a\u00a0s\u00a0t\u00fdmto z\u00e1konom.<\/p>\n<p><strong>f)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee stavebn\u00e9mu \u00faradu doru\u010denom posudku poruchy stavby pod\u013ea bodu a) a\u017e c) ods.(1) \u00a7 96, je stavba, alebo jej \u010das\u0165 ozna\u010den\u00e1 ako nebezpe\u010dn\u00e1 na \u017eivote, zdrav\u00ed a\u00a0majetku, alebo inak nebezpe\u010dn\u00e1, pr\u00edpadne je nebezpe\u010dn\u00e1 aj pre svoje okolie v\u00a0rozsahu ustanovenom v\u00a0posudku, je stavebn\u00fd \u00farad povinn\u00fd vlastn\u00edkovi, alebo spr\u00e1vcovi stavby nariadi\u0165 vypratanie stavby a\u00a0jej uzatvorenie tak, aby nebolo mo\u017en\u00e9 nepovolan\u00fdm osob\u00e1m na stavbu, alebo do budovy vst\u00fapi\u0165, pokia\u013e vlastn\u00edk alebo spr\u00e1vca tak e\u0161te neu\u010dinil.<\/p>\n<p><strong>g)\u00a0<\/strong> Stavebn\u00fd \u00farad ur\u010d\u00ed lehotu na vypratanie s\u00a0term\u00ednom \u201eihne\u010f\u201c pri\u010dom sa pre \u00fa\u010dely tohto nariadenia za \u201eihne\u010f\u201c pova\u017euje lehota najviac 8 hod\u00edn od doru\u010denia nariadenia na\u00a0vypratanie a\u00a0uzatvoren\u00ed stavby, alebo ozn\u00e1menia pod\u013ea odst. (2) \u00a7 96 tohto z\u00e1kona.<\/p>\n<p><strong>h)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee vlastn\u00edk, alebo spr\u00e1vca nevykon\u00e1 navrhnut\u00e9 opatrenia odporu\u010den\u00ed v posudku a ustanovenia bodu (1) v\u00a0odst. c), \u00a7 96, alebo nevykon\u00e1 nariadenie stavebn\u00e9ho \u00faradu na vypratanie a\u00a0uzatvorenie stavby, m\u00e1 stavebn\u00fd \u00farad vo verejnom z\u00e1ujme ochrany zdravia a\u00a0\u017eivatoa po uplynut\u00ed lehoty v\u00a0bode b) a\u00a0c) ods. (1) \u00a7 96 povinnos\u0165 vyprata\u0165 a uzatvori\u0165 stavbu v\u00a0s\u00fa\u010dinnosti so \u0161t\u00e1tnou pol\u00edciou, pr\u00edpadne aj \u010fal\u0161\u00edmi zlo\u017ekami miestnej a\u00a0\u0161t\u00e1tnej moci na n\u00e1klady vlastn\u00edka, alebo spr\u00e1vcu.<\/p>\n<p><strong>i)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee vlastn\u00edk, alebo spr\u00e1vca stavby nevykon\u00e1 nariadenie stavebn\u00e9ho \u00faradu na vypratanie a\u00a0uzatvorenie stavby, m\u00f4\u017ee sa dopusti\u0165 trestn\u00e9ho \u010dinu ohrozenia z\u00e1ujmu a pr\u00e1v fyzick\u00fdch a pr\u00e1vnick\u00fdch os\u00f4b a\u00a0z\u00e1ujmom spolo\u010dnosti, pr\u00edpadne in\u00e9ho s\u00fabehu poru\u0161enia z\u00e1konov prisl\u00fachaj\u00facich k\u00a0veci.<\/p>\n<p><strong>j)\u00a0<\/strong> Ak vznikne \u0161koda tretej osobe z\u00a0d\u00f4vodu nesplnenia si z\u00e1konnej povinnosti na strane osoby povinnej vykona\u0165 opatrenia pod\u013ea \u00a7 96 odst. (1) p\u00edsm. a) a\u017e i), vznik\u00e1 povinnos\u0165 plni\u0165 n\u00e1hradu takejto \u0161kody nekonaj\u00facou osobou, pri\u010dom n\u00e1rok na n\u00e1hradu \u0161kody po\u0161koden\u00e9mu nezanik\u00e1.<\/p>\n<p><strong>k)\u00a0<\/strong> Ak vznikne \u0161koda tretej osobe z\u00a0d\u00f4vodu nesplnenia z\u00e1konnej povinnosti na strane osoby povinnej vykona\u0165 opatrenia pod\u013ea \u00a7 96 odst. (1) p\u00edsm. a) a\u017e g), je nekonaj\u00faca osoba povinn\u00e1 nahradi\u0165 v\u0161etky preukazne sp\u00f4soben\u00e9 \u0161kody vr\u00e1tane pr\u00edpadnej nemajetkovej ujmy spojen\u00e9 v\u00a0d\u00f4sledku jej nekonania.<\/p>\n<p><strong>l)\u00a0<\/strong> V\u0161etky pe\u0148a\u017en\u00e9 n\u00e1klady spojen\u00e9 s\u00a0vypratan\u00edm a uzatvoren\u00edm stavby z\u00a0d\u00f4vodu v \u00a7 96 odst. (1) tohto z\u00e1kona zn\u00e1\u0161a vlastn\u00edk stavby.<\/p>\n<p><strong>m)\u00a0<\/strong> V\u0161etky pe\u0148a\u017en\u00e9 n\u00e1klady spojen\u00e9 s jej zabezpe\u010den\u00edm, stabilizovan\u00edm,\u00a0opravou a\u00a0pr\u00edpadne odstr\u00e1nen\u00edm nebezpe\u010dnej stavby zn\u00e1\u0161a vlastn\u00edk stavby.<\/p>\n<p><strong>n)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee vlastn\u00edk stavby nesp\u00f4sobil nebezpe\u010dn\u00fd stav stavby a\u00a0tento stav je sp\u00f4soben\u00fd mimo vplyv vlastn\u00edka, n\u00e1klady spojen\u00e9 s jej zabezpe\u010den\u00edm, stabilizovan\u00edm,\u00a0opravou a\u00a0pr\u00edpadne s odstr\u00e1nen\u00edm nebezpe\u010dnej stavby hrad\u00ed vlastn\u00edk stavby, alebo osoba, ktor\u00e1 tento stav sp\u00f4sobila.<\/p>\n<p><strong>o)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee nebezpe\u010dn\u00fd stav stavby sp\u00f4sobila \u017eiveln\u00e1 pohroma, n\u00e1klady spojen\u00e9 s jej zabezpe\u010den\u00edm, stabilizovan\u00edm,\u00a0opravou a\u00a0pr\u00edpadne s odstr\u00e1nen\u00edm nebezpe\u010dnej stavby hrad\u00ed vlastn\u00edk a\u00a0\u0161t\u00e1t vo verejnom z\u00e1ujme v\u00a0s\u00falade s \u00a7 89 tohto z\u00e1kona.<\/p>\n<p><strong>p)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee nebezpe\u010dn\u00fd stav stavby sp\u00f4sobil u\u017e\u00edvate\u013e stavby, n\u00e1klady spojen\u00e9 s jej zabezpe\u010den\u00edm, stabilizovan\u00edm,\u00a0opravou a\u00a0pr\u00edpadne s odstr\u00e1nen\u00edm nebezpe\u010dnej stavby hrad\u00ed tento u\u017e\u00edvate\u013e ako neob\u00eddite\u013en\u00fd n\u00e1rok vlastn\u00edka stavby.<\/p>\n<p>q<strong>)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee nebezpe\u010dn\u00fd stav stavby sp\u00f4sobil vlastn\u00edk stavby alebo jej spr\u00e1vca, n\u00e1klady spojen\u00e9 s jej zabezpe\u010den\u00edm, stabilizovan\u00edm,\u00a0opravou a\u00a0pr\u00edpadne jej odstr\u00e1nenie hrad\u00ed ten kto tento stav zapr\u00ed\u010dinil.<\/p>\n<p><strong>r)\u00a0<\/strong> Stavebn\u00fd \u00farad nezodpoved\u00e1 za pr\u00edpadn\u00e9 vzniknut\u00e9 n\u00e1klady \u0161kody ak svoje rozhodnutie o\u00a0vypratan\u00ed a\u00a0uzatvoren\u00ed stavby vydal a\u00a0vykonal vo verejnom z\u00e1ujme pod\u013ea ustanoven\u00ed 96 odst. (1).<\/p>\n<p>&nbsp;<\/p>\n<p><strong>(2)\u00a0 \u00a0 <\/strong><strong>Rozhodnutie o vypratan\u00ed stavby pod\u013ea odseku 1 mo\u017eno ozn\u00e1mi\u0165<\/strong><\/p>\n<p><strong>a)\u00a0<\/strong> \u00fastne pred zvolan\u00fdmi osobami u\u017e\u00edvaj\u00facimi a\u00a0pohybuj\u00facimi sa v\u00a0stavbe, alebo na stavbe osobou, ktor\u00e1 objednala a\u00a0obdr\u017eala posudok o\u00a0nebezpe\u010dnom stave stavby, pr\u00edpadne pr\u00edslu\u0161n\u00fdm stavebn\u00fdm \u00faradom;<\/p>\n<p><strong>b)\u00a0<\/strong> \u00fastne prostredn\u00edctvom audio zariadenia umiestnen\u00e9ho v\u00a0budove pr\u00edpadne v\u00a0jej priamom susediacom okol\u00ed;<\/p>\n<p><strong>c)\u00a0<\/strong> \u00fastne prostredn\u00edctvom audio telekomunika\u010dn\u00e9ho zariadenia (mobiln\u00fd telef\u00f3n, pevn\u00fd telef\u00f3n a\u00a0pod.);<\/p>\n<p><strong>d)\u00a0<\/strong> elektronicky p\u00edsmom prostredn\u00edctvom telekomunika\u010dn\u00e9ho zariadenia (sms, email a\u00a0pod.);<\/p>\n<p><strong>e)\u00a0<\/strong> p\u00edsomne verejnou vyhl\u00e1\u0161kou pr\u00edslu\u0161n\u00e9ho stavebn\u00e9ho \u00faradu, s\u00a0v\u00fdveskou na oznamovac\u00edch tabuliach mesta, alebo obce.<\/p>\n<p><strong>f)\u00a0<\/strong> V\u00a0pr\u00edpade, \u017ee sa osoba, ktorej sa t\u00fdka vypratanie a\u00a0obmedzenie pr\u00edstupu do, alebo na stavbu, odmietne podriadi\u0165 nariadeniu, alebo odmietne prija\u0165 oznam o\u00a0nariaden\u00ed (napr. nepreberie a nepodp\u00ed\u0161e prevzatie nariadenia stavebn\u00e9ho \u00faradu na spolo\u010dnom zvolanom stretnut\u00ed), bude tak\u00e1to osoba na z\u00e1klade nariadenia o\u00a0vypratan\u00ed a uzatvoren\u00ed\u00a0 stavby vypratan\u00e1 \u0161t\u00e1tnou pol\u00edciou.<\/p>\n<p><strong>(3) \u00a0\u00a0\u00a0<\/strong> Stavebn\u00fd \u00farad nariadi vypratanie stavby aj vtedy, ak je to potrebn\u00e9 na vykonanie neodkladn\u00fdch zabezpe\u010dovac\u00edch pr\u00e1c, nevyhnutn\u00fdch \u00faprav a\u00a0\u00fadr\u017eby, ktor\u00e9 s\u00e1m nariadil. Postupuje pri tom primerane pod\u013ea odst. (1).<\/p>\n<p><strong>(4) \u00a0\u00a0\u00a0<\/strong> Vlastn\u00edk alebo spr\u00e1vca nariadi vypratanie stavby aj vtedy, ak je to potrebn\u00e9 na vykonanie neodkladn\u00fdch zabezpe\u010dovac\u00edch pr\u00e1c, nevyhnutn\u00fdch \u00faprav a\u00a0\u00fadr\u017eby, ktor\u00e9 s\u00e1m nariadil. Postupuje pri tom primerane pod\u013ea odseku 1. V\u00a0takomto pr\u00edpade sa vlastn\u00edk alebo spr\u00e1vca riadi ustanoven\u00edm \u00a7 96 odst. (2) primerane v\u00a0s\u00fa\u010dinnosti so stavebn\u00fdm \u00faradom, pr\u00edpadne po\u017eiada stavebn\u00fd \u00farad o\u00a0nariadenie a\u00a0konanie vo veci. Oznamovacia povinnos\u0165 vlastn\u00edka, alebo spr\u00e1vcu vo\u010di stavebn\u00e9mu \u00faradu t\u00fdmto nezanik\u00e1 !<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong> \u00a7 96a <\/strong><\/p>\n<p>Rozhodnutia stavebn\u00e9ho \u00faradu vydan\u00e9 pod\u013ea \u00a7 86, 87, 88, 88a, 94 a 96 s\u00fa z\u00e1v\u00e4zn\u00e9 aj pre pr\u00e1vnych n\u00e1stupcov vlastn\u00edkov stavby a\u00a0ich spr\u00e1vcov.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Z\u00e1vere\u010dn\u00e9 zd\u00f4vodnenie <\/strong><\/p>\n<p><strong>(1)\u00a0<\/strong> In\u00fdm d\u00f4vodom vo verejnom z\u00e1ujme a\u00a0v\u00a0z\u00e1ujme Slovenskej republiky je na \u00fa\u010dely tohto nariadenia skuto\u010dnos\u0165, ktorej existencia m\u00e1 z\u00e1sadn\u00fd v\u00fdznam pre spolo\u010dnos\u0165 a\u00a0jej zoh\u013eadnenie je z h\u013eadiska \u00faloh \u0161t\u00e1tu opr\u00e1vnen\u00fdm z\u00e1ujmom Slovenskej republiky ma\u0165 bezpe\u010dn\u00e9 a\u00a0kvalitn\u00e9 stavby a\u00a0ich bezpe\u010dn\u00e9 dlhodob\u00e9 u\u017e\u00edvanie a\u00a0zabezpe\u010di\u0165 osobn\u00fa zodpovednos\u0165 a zv\u00fd\u0161enie vymo\u017eite\u013enosti pr\u00e1va pri zanedban\u00ed starostlivosti o\u00a0stavby a\u00a0ich pr\u00edpadn\u00fd kolaps.<\/p>\n<p><strong>(2)\u00a0<\/strong> V\u0161etky dotknut\u00e9 \u00fatvary ministerstiev ako aj \u017eivnostensk\u00e9 \u00farady prijm\u00fa opatrenia na zabezpe\u010denie \u00faloh z\u00a0tohto nariadenia.<\/p>\n<p>Tento n\u00e1vrh nadob\u00fada \u00fa\u010dinnos\u0165 d\u0148om uverejnenia v\u00a0zbierke z\u00e1konov.<\/p>\n<p>&nbsp;<\/p>\n<p>V\u00a0Nitre 17. 02. 2017<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><strong>SKSR Stavebn\u00e1 komora Slovenskej republiky<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Ivan Pauer<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Prezident SKSR<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>V\u00e1\u017een\u00e1 pani poslanky\u0148a, v\u00e1\u017een\u00fd poslanec, pre nez\u00e1ujem Ministerstva dopravy a\u00a0v\u00fdstavby rie\u0161i\u0165 problematiku verejn\u00e9ho z\u00e1ujmu ma\u0165 kvalitn\u00e9 a\u00a0bezpe\u010dn\u00e9 stavby, ku ktor\u00e9mu je nutn\u00e9 zaradi\u0165 aj kvalitn\u00fa \u00fadr\u017ebu stavieb a\u00a0st\u00e1le \u010dastej\u0161ie havarijn\u00e9 situ\u00e1cie stavieb na Slovensku, sme v\u00a0tomto z\u00e1ujme povinn\u00ed obozn\u00e1mi\u0165 v\u00e1s so s\u00fa\u010dasn\u00fdm stavom v\u00a0tak\u00fdchto pr\u00edpadoch a\u00a0navrhn\u00fa\u0165 V\u00e1m sp\u00f4sob legislat\u00edvneho opatrenia, ako tento zhor\u0161uj\u00faci stav zastavi\u0165 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2231,"menu_order":5,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2316","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2316"}],"version-history":[{"count":3,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2316\/revisions"}],"predecessor-version":[{"id":2323,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2316\/revisions\/2323"}],"up":[{"embeddable":true,"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=\/wp\/v2\/pages\/2231"}],"wp:attachment":[{"href":"https:\/\/www.stavebnakomora.sk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}